Let me explain.
I setup an asset, create its asset lines and put it into running state.
Later I realized I put a wrong start date for the asset. At this moment no move has been created or posted.
How can I revert to draft state to fix the date?
If it is not possible, how can I fix my mistake?
pokoli
(Sergi Almacellas Abellana)
2
You should have a look to this issue:
https://bugs.tryton.org/issue9939
ced
(Cédric Krier)
3
I guess it may be possible to allow to update the start date with the wizard as long as there is no posted lines.
I can not do that, Running the wizard let me to update the final date but not the start date of the asset.
Furthermore, I added a new comment to the issue reflecting the behavior @pokoli proposes is the expected behavior for me too.
Thank you for your quick responses .